Along with the construction of Ram temple, Prime Minister Narendra Modi and BJP envision to make Ayodhya the cultural capital of the world till the completion of 100 years of independence or rather step in the direction of realizing the dream have begun to increase.
According to the report of Hindustan Times, Union Road Transport Minister Nitin Gadkari has prepared a proposal for projects worth 20 thousand crores from his ministry alone.
Recently 84 Kosi Parikrama Marg has got the status of National Highway. Not only this, approval has also been given for the construction of a highway of 275 km at a cost of four thousand crores. Apart from this, the project to make Gorakhpur-Lucknow National Highway six laning via Ayodhya at a cost of ten thousand crores has also got the green signal.
Apart from this, about 70 km of ring road, which has now been named as bypass road, has also been approved at a cost of six thousand crores. Union Road Transport Minister Gadkari will lay its foundation stone on January 6.
Also Read – Corona explosion in Bihar second largest hospital, 87 doctors and students Covid positive
The 70 km ring road will pass through three districts of Ayodhya, Basti and Gonda. Its DPR has been prepared by the Ahmedabad-based company, which includes compensation for the acquired land.
According to MP Lallu Singh, four railway overbridges, two bridges on the Saryu river and five major roads are to be constructed. Connectivity with this bypass will be better than before. Businessmen will also benefit along with religious tourism.
A 275 km long 84 Kosi Parikrama Marg will be built in Ayodhya at a cost of about four thousand crore rupees, for which the NH Wing of PWD has completed the survey. 51 pilgrimage sites of mythological importance of Ayodhya will be connected through this route.
At present, this parikrama route passing through Ayodhya, Ambedkar Nagar, Gonda, Barabanki and Basti is about 233 km long. For this, 45 meters of land will be taken in width.
The work of taking land for this project of about four thousand crore rupees is to be completed by December 2022. The Parikrama Marg to be built by the Union Ministry of Road Transport and Highways will be 275 km long.