Ghaziabad News: The residents of Ghaziabad have excellent news. The historic railway station will soon be gifting its patrons with multi-level parking. There will be more than 500 spaces available for parking in this multi-level lot for both two and four-wheel drive cars. In addition, a parking structure will be constructed at the railway station, and a road map is being prepared by railway officials. At the railway station, more than 200 trains make stops.
Daily Commuter Influx
About 1.5 lakh passengers go up and down from Ghaziabad railway station every day. At a time 20 to 25 thousand passengers stay at the station during morning and evening hours. These passengers use their own vehicles while commuting. For this, vehicles have to be parked in the parking lot outside the station. Due to the high number of vehicles, the parking is often filled with vehicles. In such situations people face problems. The parking space currently provided by the Railway Administration is not enough. In such a situation, there was a demand for multi-level parking here for a long time. The railway station is now being renovated under the Amrit Bharat Scheme.
Integration with Metro Train Station
On the layout of a metro train station, the railway station is being developed. In order to accommodate more cars in such a scenario, greater parking arrangements with the new structure are planned. Railroad authorities are currently creating a road plan for the station’s multi-level parking in preparation for this. Here, work on the parking structure will begin concurrently with the construction of the new building. In addition to the passengers on the train, the local population will also benefit from it. They will also have access to a secure parking area for their vehicle.
Parking Lot Placement
After the main building’s outside structure is completed, railway officials will determine the best spot for the multi-level parking lot outside the station. In the first phase, the station’s new building will be completed. The goal is to have it built by December 2025. The building’s exterior outlet will be ready first. The interior structure will be worked on after this.
Keep watching our YouTube Channel ‘DNP INDIA’. Also, please subscribe and follow us on FACEBOOK, INSTAGRAM, and TWITTER.